Section: 8
Hours: 8
Next up is attaching the horizontal stabilizer rear spar. I was able to use the rivet squeezer to set the flush rivets along the whole length.
The last step was to blind rivet the internal ribs to the rear spar.
Disclaimer: This blog is to provide others insight into my experience and for my own historical purposes. Airplane construction is a serious affair. I have no authoritative skills relating to airplane construction. As such, any use of the information contained on this blog is at your own risk.
Showing posts with label Section 8. Show all posts
Showing posts with label Section 8. Show all posts
Friday, August 21, 2015
Wednesday, August 19, 2015
Section: 8
Hours: 8
Today I clecoed the horizontal stab skins to the forward spar / rib assembly and began riveting them together. Initially you have to pull some rivets deep inside the structure to attach the nose ribs to the forward spar. I had a hard time getting a grip on the rivet puller so I added some handle extensions made out of pvc pipe.
Next I riveted the skins to the forward spar.
Hours: 8
Today I clecoed the horizontal stab skins to the forward spar / rib assembly and began riveting them together. Initially you have to pull some rivets deep inside the structure to attach the nose ribs to the forward spar. I had a hard time getting a grip on the rivet puller so I added some handle extensions made out of pvc pipe.
Next I riveted the skins to the forward spar.
Tuesday, August 18, 2015
Section: 8
Hours: 8
I attached the inboard hinge bracket assembly to the rear spar using the AN3-5A bolt washer and nuts called out in the plans. I torqued the nuts to 28in/pounds and marked the nuts with torque shellac.
Then I inserted the nose ribs and riveted them to the skins. I finished up the day inserting the forward spar and rib assembly. I added enough clecos to bring the structure into alignment in the cradles. It's beginning to look like an airplane part!
Monday, August 17, 2015
Section: 8
Hours: 8
Another GREAT day- more riveting. Today I completed riveting together the spar and ribs for the horizontal stabilizer. The center of the spar has some flush rivets that I set using the mushroom set in the rivet gun. I clamped the spar to the work table so it wouldn't move while setting the rivets.
Next I assembled the center webbing and ribs to the sub spars. I used the squeezer and the rivet gun. Not all the rivets were reachable with the squeezer.
The spar is slightly bowed at this point due to dimpling the flanges. When the spar is attached to the skins, the bow is pulled out.
By the end of the day I was able to set up the cradle and mount the skins. Tomorrow I'll rivet the ribs and spar to the skins.
Hours: 8
Another GREAT day- more riveting. Today I completed riveting together the spar and ribs for the horizontal stabilizer. The center of the spar has some flush rivets that I set using the mushroom set in the rivet gun. I clamped the spar to the work table so it wouldn't move while setting the rivets.
Next I assembled the center webbing and ribs to the sub spars. I used the squeezer and the rivet gun. Not all the rivets were reachable with the squeezer.
By the end of the day I was able to set up the cradle and mount the skins. Tomorrow I'll rivet the ribs and spar to the skins.
Sunday, August 16, 2015
Subscribe to:
Posts (Atom)